Micro-grid PV+ BESS Project
model:Project Energy Storage Cases
See Details






Location: Chile
Capacity: 2.5MWp PV, 2MW/4MWh
Project Description: It supplies power to an isolated island resort in Chile, with a 6.6 kV networking design. Photovoltaic power handles on-site loads during the daytime and charges the battery system simultaneously. At night, power is supplied by batteries, with diesel generators serving as standby power.